installazione artistica - magon sistemi_cimg evidenza

L’Oréal Sculpture

location

Milano, IT

OWNER

Covivio

ARCHITECTURAL DESIGN

Progetto CMR
Massimo Roj Architects

ARTISTIC DIRECTION

Progetto CMR
Massimo Roj Architects

GENERAL CONTRACTOR

Costruzioni Generali Gilardi Spa

STRUCTURAL DESIGN

Magon Sistemi

STRUCTURAL ANALYSIS

Magon Sistemi

MATERIALS

Steel, Wood, Stainless stees

PHOTOS

Matteo Magon

installazione artistica - magon sistemi
The context

The project is located in the south-west of Milan and involves the regeneration of the former Vedani Foundry site, which has been transformed into The Sign business district, developed by Covivio.

The office complex, with a total office space of approximately 40,000 square metres, comprises four buildings, a public square, green spaces and service areas.

The district is home to the Italian headquarters of Aon, NTT Data and L’Oréal.

The masterplan, designed by Progetto CMR, represents one of the key office developments in the process of transforming Milan’s former industrial areas.

The project

Costruzioni Generali Gilardi SpA, the contractor for The Sign project, commissioned Magon Sistemi to create a metal sculpture to be installed in front of the L’Oréal headquarters.

The work, standing 4.5 metres tall, is an art installation comprising six stainless steel totems, constructed without visible fixings, paying homage to the Vedani Foundry which operated in this area in the 1950s.

The arrangement of the totems is designed to offer two different viewing angles: from the first, the forms align to form a single monolith, whilst from the other, they appear as six distinct pillars in a parallel sequence.

installazioni artistiche all aperto - magon sistemi_progetto
installazione arte contemporanea - magon sistemi
The intervention

In 2025, Magon Sistemi developed the detailed design and structural calculations for the six totems, before proceeding with the construction of the supporting framework using galvanised steel tubes, with bases anchored to the floor slab.

The structure was subsequently clad with marine-grade okoumé plywood panelling and finished with thin sheets of Scotch-Brite-satin-finished AISI 316 stainless steel, bonded to the wooden substrate to ensure surface continuity and the absence of visible fixings.

installazioni artistiche all aperto - magon sistemi_totem
installazione arte moderna - magon sistemi_ dettaglio frontale
installazioni contemporanee - magon sistemi_macro totem
The project included the integration of LED lighting within two totems and the creation of a stainless-steel placeholder disc.

The construction and assembly of the structure were completed within two months.

Quality does not mean perfection but control of detail.

Find out about the projects implemented