The context
For the Jubilee 2025, the Fabbrica di San Pietro decided to replace the stained-glass window protecting Michelangelo’s Pietà, approving the initiative of some donors from Piemonte as well as professionals.
The violent hammer blows broke the left arm, shattered the elbow, and destroyed the nose and eyelids of the Virgin Mother.
The image of the broken sculpture moved the world.
From that moment on, the way of protecting art masterpieces changed forever.
Survey, design and calculation
After the laser scanner surveys, Magon carried out the 3D modelling and glass-steel structural analysis, entrusting the FEM calculation to engineer Fabio Rusconi, who verified crowd thrust, seismic action, internal pressure, bracing ropes, and post-breakage.
Tests carried out at the Banco Nazionale di Prova and at the Giordano show that the glazing resists 9mm calibre bullets (BR2/S according to EN1063) and 26 axe/hammer blows (class close to P6B according to EN356).
The façade consists of 2 horizontal 12 cm high beams and 2 minimal profiles that house the lower ground glazing and support the upper arched glazing.
The first beam, placed 110 cm from the floor, discharges to the ground through 2 tapered 20 mm steel plates.
There are 9 panes: the central ones are 5.9 metres high and the largest is 3.1 metres wide.
The tensile structure behind is made of 6mm diameter spiral ropes and stainless-steel spacers on the back of the beams, hidden from view.
The intervention
Magon, together with its Swiss partner Simone Martinalli, technical site manager, replaced the glass in the external arch with OmniDecor® DecorFlou Reflecting grey 6mm tempered glass and replaced the old glazing from 1973 using Saint Gobain® Diamant 1010.12 toughened glass with 4.56mm DG41 rigid plastic.
The glass-to-steel silicone joint is of the Sika® structural type, Sikasil SG-500.
Spacers, turnbuckles, and end caps are made by stainless steel, customised to drawing.
On 29 October 2024, at the end of the installation, an inspection of the tensile structure is carried out with a tensiometer at 200 kg, in the presence of engineer Odine Manfroni.
On 24 December 2024, Pope Francis opens the Holy Door.